Preventive interventions to extend asset lifespan and reduce downtime
- Marine Growth Removal – High-pressure jetting or mechanical brushing on jacket legs, risers, and pipelines to reduce drag and allow accurate inspections.
- Anode Replacement & CP System Maintenance – Retrofitting sacrificial or impressed current anodes to ensure adequate corrosion protection.
- Coating Touch-ups & Encapsulation – Underwater application of protective coatings or installation of encapsulation systems for structural members.
- Pipeline Support Reinstatement – Installation of grout bags, concrete mattresses, addle supports or rock dumping under free-spanning pipelines.
- Riser Clamps & Guide Maintenance – Visual checks, cleaning, realignment, and torque verification for clamp and guide systems.
- Component replacement – such as valves or connectors.
- SPM/SBM operations support – anode replacement on the buoy, MGR, PLEM valve operation, floating and subsea hose replacement.